Metro Trains Melbourne - Easy Access To Railway Equipment
Project
Caulfield Railway Station, Caulfield East VIC
Installer
Level Crossing Removal Authority (LXRA)
Products
KOMBI Access Platform Systems
Situation
The Level Crossing Removal Project is a government initiative commissioned to remove 75 level crossings in Melbourne. The LXRA consortium required a platform to access a signalling monitor at the Caulfield Railway Station.
Solution
Having used the KOMBI modular system on other parts of the Level Crossing Removal Program, SAYFA was LXRA’s first port of call and the KOMBI system the product of choice.
For the initial part of this project, SAYFA attended site to gather specific location information and to provide technical advice. The SAYFA team then designed a custom built KOMBI access platform that would fit seamlessly around the monitor.
After fabrication, KOMBI systems were supplied in kit form direct to the location. With no requirement for specialist skills, tools or permits KOMBI was easily assembled and adjusted on-site by LXRA personnel.
The platform now provides railway personnel maintenance free, safe and easy access to equipment.
Sayfa
MELBOURNE Office
1029 Mountain Highway,
Boronia VIC 3155
Australia
View in google maps+61 3 8727 9000
+61 3 8727 9099
info@sayfa.com.au